|
|
|
|

|
|
In League City, Texas, on prestigious Clear Lake, CL&I designed and constructed this elegant concrete pathway down a steep 12 foot elevation to the boat dock. Everything had to be perfectly asymmetric. And it is. This job took 18 days to complete – two days ahead of schedule.
|
|
|